0
0 ItemsKč0.00
ex VAT
ex VAT

Rework System Accessories:

22 Products Found
Find a huge range of Rework System Accessories at Farnell Česká republika. We stock a large selection of Rework System Accessories, including new and most popular products from the world's top manufacturers including: Hakko, Metcal & Multicomp Pro
View
Buyer
Engineer
Manufacturer
Desolder Tool Type
Accessory Type
For Use With
Kit Contents
Product Range
Plug Type
Packaging
No Filter(s) Applied
0 Filter(s) Selected
ComparePrice ForQuantity
4006658

RoHS

1 In stock
Each
1+
Kč845.698
Min: 1 / Mult: 1
-
Bent Bayonet Nozzle
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
4006659

RoHS

2 In stock
Each
1+
Kč845.698
Min: 1 / Mult: 1
-
Bent Bayonet Nozzle
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
3935594

RoHS

4 In stock
Each
1+
Kč3,951.856
Min: 1 / Mult: 1
-
Turbine W/ Motor
Soldering Stations
Soldering Stations
-
-
4034895

RoHS

27 In stock
Each
1+
Kč867.016
5+
Kč780.239
Min: 1 / Mult: 1
Gun
Hot Air Gun
MP740907 Double Channel Rework System
Hot Air gun
Multicomp Pro Rework Stations
NA
4006654

RoHS

2 In stock
Each
1+
Kč2,076.624
Min: 1 / Mult: 1
-
Replacement Heater
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
4006657

RoHS

2 In stock
Each
1+
Kč845.698
Min: 1 / Mult: 1
-
Bayonet Nozzle
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
3934633

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč1,446.865
Min: 1 / Mult: 1
-
Edge Board Support
Hakko FR-810B Hot Air SMD Rework Station
Edge Board Support
-
-
3934636

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč2,336.954
Min: 1 / Mult: 1
-
Positioning Unit
Hakko FR-810B Hot Air SMD Rework Station
Positioning Unit
-
-
3934634

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč18,324.702
Min: 1 / Mult: 1
-
Board Support Unit
Hakko FR-810B Hot Air SMD Rework Station
Board Support Unit
-
-
3934533

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
Each
1+
Kč2,786.137
Min: 1 / Mult: 1
-
Extension Pipe
Preheaters
Extension Pipe with Lid
-
-
3934630

RoHS

Available to Order
Manufacturer Standard Lead Time: 22 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč34,459.920
Min: 1 / Mult: 1
-
Board Holder
Hakko FR-810B Hot Air SMD Rework Station
Board Holder
-
-
3934625

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč2,274.505
Min: 1 / Mult: 1
-
Mica
Hakko FR-810B Hot Air SMD Rework Station
Mica
-
-
3934624

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč1,074.427
Min: 1 / Mult: 1
-
Pipe
Hakko FR-810B Hot Air SMD Rework Station
Pipe
-
-
4006660

RoHS

Available to Order
Manufacturer Standard Lead Time: 4 week(s)
Each
1+
Kč845.698
Min: 1 / Mult: 1
-
Bayonet Nozzle
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
3934629

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
5 Set
Non-Cancellable / Non-Returnable
1+
Kč539.722
Min: 1 / Mult: 1
-
Pad
Hakko FR-810B Hot Air SMD Rework Station
5 Pcs of 3mm Dia Pads
-
-
3934626

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
5 Set
Non-Cancellable / Non-Returnable
1+
Kč503.857
Min: 1 / Mult: 1
-
Pad
Hakko FR-810B Hot Air SMD Rework Station
5 Pcs of 7.6mm Dia Pads
-
-
4006656

RoHS

Available to Order
Manufacturer Standard Lead Time: 4 week(s)
Each
1+
Kč845.698
Min: 1 / Mult: 1
-
Bayonet Nozzle
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
3934635

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
4 Set
Non-Cancellable / Non-Returnable
1+
Kč432.379
Min: 1 / Mult: 1
-
Rubber Foot
Hakko FR-810B Hot Air SMD Rework Station
Rubber Foot
-
-
3934628

RoHS

Available to Order
Manufacturer Standard Lead Time: 16 week(s)
5 Set
Non-Cancellable / Non-Returnable
1+
Kč503.857
Min: 1 / Mult: 1
-
Pad
Hakko FR-810B Hot Air SMD Rework Station
5 Pcs of 5mm Dia Pads
-
-
3934632

RoHS

Available to Order
Manufacturer Standard Lead Time: 22 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč58,687.200
Min: 1 / Mult: 1
-
Grip Fixture L
Hakko FR-810B Hot Air SMD Rework Station
Grip Fixture L
-
-
4006655

RoHS

Available to Order
Manufacturer Standard Lead Time: 4 week(s)
Each
1+
Kč845.698
Min: 1 / Mult: 1
-
Bayonet Nozzle
HCT-910 Hot Air Rework System
-
HCT-910 Series
-
3934631

RoHS

Available to Order
Manufacturer Standard Lead Time: 22 week(s)
Each
Non-Cancellable / Non-Returnable
1+
Kč52,943.880
Min: 1 / Mult: 1
-
Grip Fixture M
Hakko FR-810B Hot Air SMD Rework Station
Grip Fixture M
-
-
1-22 of 22 items
of 1 page(s)

Best Selling Products

0 Products Found

Popular Suppliers

WELLER
METCAL
3M
ELECTROLUBE
TECHSPRAY
IDEAL-TEK
KNIPEX
CK TOOLS
Trade Account
An Avnet Company© 2025 Premier Farnell Limited. All Rights Reserved.
Farnell is a trading name of Premier Farnell UK Limited.
Registered number: 860093 | Registered office: 150 Armley Road, Leeds, LS12 2QQ, England.